West Roxbury: Outdoor Oasis
At the house, out front we get to know the contractor while Ipe is being installed on the porch ceiling. Out back, a brick patio is laid. Inside, a dual fuel HVAC system is installed and ducts ran. At the Dracut Centre School, corbels are restored.